Madrid Monitor

New: Use the 'Designation status' tab to easily check the status of protection of your international trademark registration in designated Madrid System Members; download unofficial certificates of protection; and more. Find out more and send us your feedback
Switch to the old version of Madrid Monitor.
 
 

International Trademark
 

1600886- FREE SHIFT

 
Trademark Holder Registration Date Expiration Date Nice classes
FREE SHIFT
SHIMANO INC.
29.03.2021
29.03.2031
12
Printed : 10/03/2011
732
Name and address of the holder of the registration
SHIMANO INC.
3-77, Oimatsu-cho,
Sakai-ku,
Sakai City
Osaka 590-8577 (JP)
811
Contracting State of which the holder is a national
JP
842
Legal nature of the holder (legal entity) and State, and, where applicable, territory within that State where the legal entity is organized
CORPORATION, JAPAN
740
Name and address of the representative
TSUJIMOTO KIYOSHI
TSUJIMOTO LAW & PATENT FIRM,
Nice-One Building,
6-20, Ueshio 2-chome,
Chuo-ku, Osaka-shi
Osaka 542-0064 (JP)
541
Reproduction of the mark where the mark is represented in standard characters
511
International Classification of Goods and Services for the Purposes of the Registration of Marks (Nice Classification) - NCL(11-2021)
12

Bicycles, including electric bicycles; parts, fittings and accessories for bicycles, including electric bicycles, namely, hubs, internal gear hubs, bicycle hub which contains dynamo inside, bicycle hub which contains bicycle power meter inside, hub quick release levers, hub quick release devices, axles of hubs, derailleurs, chain guides, freewheels, sprockets, pulleys adapted for use with bicycles, chains, cranks, crank which contains bicycle power meter inside, crank sets, front chain wheels, pedals, pedal which contains bicycle power meter inside, bicycle pedal cleats, toe clips, brake levers, brakes, brake cables, brake shoes, rims, brake rotors, brake pads, wheels, tires, inner tubes, spokes, spoke clips, bottom brackets, seat pillars, head parts for frame-fork assembly, suspensions, handlebars, handlebar stems, grips for handlebars, bar ends, seat posts, saddles, gear position indicators for bicycles, electric motors for bicycles, switches for bicycles.

821
Basic application
JP, 21.01.2021, 2021-006175
300
Data relating to priority under the Paris Convention and other data relating to registration of the mark in the country of origin

JP, 21.01.2021, 2021-006175

832
Designation(s) under the Madrid Protocol
BA - BN - BT - BY - CA - CH - CN - CO - EM - GB - ID - IL - IN - IR - IS - KH - KR - MD - ME - MK - MN - MX - MY - NO - NZ - PH - RS - RU - SG - TH - TN - TR - TT - UA - US - VN

Transaction History
 
International Registration, BA, BN, BT, BY, CA, CH, CN, CO, EM, GB, ID, IL, IN, IR, IS, KH, KR, MD, ME, MK, MN, MX, MY, NO, NZ, PH, RS, RU, SG, TH, TN, TR, TT, UA, US, VN  08.07.2021, 2021/25 Gaz 
151
Date of the registration
29.03.2021
450
Publication number and date
2021/25 Gaz, 08.07.2021 
832
Designation(s) under the Madrid Protocol
BA - BN - BT - BY - CA - CH - CN - CO - EM - GB - ID - IL - IN - IR - IS - KH - KR - MD - ME - MK - MN - MX - MY - NO - NZ - PH - RS - RU - SG - TH - TN - TR - TT - UA - US - VN
851
Limitation of the list of goods and services
MX - US
 
List limited to:
12

Bicycles, including electric bicycles; parts, fittings and accessories for bicycles, including electric bicycles, namely, hubs, derailleurs, cranks, crank sets, front chain wheels, electric motors for bicycles.

851
Limitation of the list of goods and services
TH
 
List limited to:
12

Bicycles; electric bicycles; bicycle hubs; electric bicycles hubs; internal gear hubs for bicycles; internal gear hubs for electric bicycles; hub quick release levers for bicycles; hub quick release levers for electric bicycles; bicycle wheel hub quick release devices; electric bicycle wheel hub quick release devices; bicycle brake hub quick release devices; electric bicycle brake hub quick release devices; bicycle derailleurs; electric bicycle derailleurs; bicycle chain guides; electric bicycle chain guides; bicycle freewheels; electric bicycle freewheels; bicycle sprockets; electric bicycle sprockets; pulleys adapted for use with bicycles; pulleys adapted for use with electric bicycles; chains for bicycles; chains for electric bicycles; bicycle cranks; electric bicycle cranks; cranksets (bicycle parts); cranksets (parts of electric bicycles); front chain wheels for bicycles; front chain wheels for electric bicycles; bicycle pedals; electric bicycle pedals; bicycle pedal cleats; electric bicycle pedal cleats; bicycle toe clips; electric bicycle toe clips; bicycle brake levers; electric bicycle brake levers; bicycle brakes; electric bicycle brakes; bicycle brake cables; electric bicycle brake cables; bicycle brake shoes; electric bicycle brake shoes; bicycle rims; electric bicycle rims; bicycle brake rotors; electric bicycle brake rotors; bicycle brake pads; electric bicycle brake pads; bicycle wheels; electric bicycle wheels; bicycle tires; electric bicycle tires; bicycle inner tubes; electric bicycle inner tubes; bicycle spokes; electric bicycle spokes; bicycle spoke clips; electric bicycle spoke clips; bicycle bottom brackets; electric bicycle bottom brackets; bicycle seat pillars; electric bicycle seat pillars; bicycle headsets for assembling into head tubes of bicycle frame; electric bicycle headsets for assembling into head tubes of bicycle frame; bicycle handlebars; electric bicycle handlebars; bicycle handlebar stems; electric bicycle handlebar stems; grips for bicycle handlebars; grips for electric bicycle handlebars; bicycle bar ends; electric bicycle bar ends; bicycle seat posts; electric bicycle seat posts; bicycle saddles; electric bicycle saddles; gear position indicators for bicycles; gear position indicators for electric bicycles; push start switches for bicycles; push start switches for electric bicycles; gear shifting switches for bicycles; gear shifting switches for electric bicycles; bicycle ring switches; electric bicycle ring switches; axles of hubs for bicycles; axles of hubs for electric bicycles; bicycle suspensions; electric bicycle suspensions; electric motors for bicycles; electric motors for electric bicycles.

581
Date of notification by the International Bureau to the designated Contracting Parties (from which the time limit to notify the refusal starts)
08.07.2021
270
Language of the application
English 
[PDF] Total provisional refusal of protection, IN  12.08.2021, 2021/30 Gaz 
833
Interested Contracting Party(ies)
IN
450
Publication number and date
2021/30 Gaz, 12.08.2021 
580
Date of notification
30.07.2021
 
Date of receipt by the International Bureau
20.07.2021
[PDF] Ex Officio examination completed but opposition or observations by third parties still possible, under Rule 18bis(1), EM  12.08.2021, 2021/30 Gaz 
833
Interested Contracting Party(ies)
EM
450
Publication number and date
2021/30 Gaz, 12.08.2021 
 
Opposition end date
09.11.2021
[PDF] Total provisional refusal of protection, PH  19.08.2021, 2021/31 Gaz 
833
Interested Contracting Party(ies)
PH
450
Publication number and date
2021/31 Gaz, 19.08.2021 
580
Date of notification
05.08.2021
 
Date of receipt by the International Bureau
19.07.2021
[PDF] Total provisional refusal of protection, IR  26.08.2021, 2021/32 Gaz 
833
Interested Contracting Party(ies)
IR
450
Publication number and date
2021/32 Gaz, 26.08.2021 
580
Date of notification
11.08.2021
 
Date of receipt by the International Bureau
27.07.2021
[PDF] Ex Officio examination completed but opposition or observations by third parties still possible, under Rule 18bis(1), NZ  07.10.2021, 2021/38 Gaz 
833
Interested Contracting Party(ies)
NZ
450
Publication number and date
2021/38 Gaz, 07.10.2021 
 
Opposition end date
24.12.2021
[PDF] Statement of grant of protection made under Rule 18ter(1), RU  04.11.2021, 2021/42 Gaz 
833
Interested Contracting Party(ies)
RU
450
Publication number and date
2021/42 Gaz, 04.11.2021 
 
Date of receipt by the International Bureau
18.10.2021
[PDF] Total provisional refusal of protection, CN  25.11.2021, 2021/45 Gaz 
833
Interested Contracting Party(ies)
CN
450
Publication number and date
2021/45 Gaz, 25.11.2021 
861
Total provisional refusal of protection
This provisional refusal is not subject to review or appeal before this Office. It is deemed to include a declaration of confirmation of total provisional refusal under Rule 18ter(3). 
580
Date of notification
12.11.2021
 
Date of receipt by the International Bureau
26.10.2021
[PDF] Ex Officio examination completed but opposition or observations by third parties still possible, under Rule 18bis(1), TR  18.11.2021, 2021/44 Gaz 
833
Interested Contracting Party(ies)
TR
450
Publication number and date
2021/44 Gaz, 18.11.2021 
 
Opposition end date
27.10.2021
Statement of grant of protection made under Rule 18ter(1), TR  02.12.2021, 2021/46 Gaz 
833
Interested Contracting Party(ies)
TR
450
Publication number and date
2021/46 Gaz, 02.12.2021 
 
Date of receipt by the International Bureau
15.11.2021
[PDF] Ex Officio examination completed but opposition or observations by third parties still possible, under Rule 18bis(1), SG  02.12.2021, 2021/46 Gaz 
833
Interested Contracting Party(ies)
SG
450
Publication number and date
2021/46 Gaz, 02.12.2021 
[PDF] Statement of grant of protection made under Rule 18ter(1), EM  09.12.2021, 2021/47 Gaz 
833
Interested Contracting Party(ies)
EM
450
Publication number and date
2021/47 Gaz, 09.12.2021 
 
Date of receipt by the International Bureau
25.11.2021
[PDF] Statement of grant of protection made under Rule 18ter(1), GB  16.12.2021, 2021/48 Gaz 
833
Interested Contracting Party(ies)
GB
450
Publication number and date
2021/48 Gaz, 16.12.2021 
 
Date of receipt by the International Bureau
01.12.2021
[PDF] Total provisional refusal of protection, IL  23.12.2021, 2021/49 Gaz 
833
Interested Contracting Party(ies)
IL
450
Publication number and date
2021/49 Gaz, 23.12.2021 
580
Date of notification
08.12.2021
 
Date of receipt by the International Bureau
29.11.2021
Statement of grant of protection made under Rule 18ter(1), BY  23.12.2021, 2021/49 Gaz 
833
Interested Contracting Party(ies)
BY
450
Publication number and date
2021/49 Gaz, 23.12.2021 
 
Date of receipt by the International Bureau
03.12.2021
[PDF] Total provisional refusal of protection, US  30.12.2021, 2021/50 Gaz 
833
Interested Contracting Party(ies)
US
450
Publication number and date
2021/50 Gaz, 30.12.2021 
580
Date of notification
17.12.2021
 
Date of receipt by the International Bureau
15.12.2021
[PDF] Total provisional refusal of protection, RS  20.01.2022, 2022/1 Gaz 
833
Interested Contracting Party(ies)
RS
450
Publication number and date
2022/1 Gaz, 20.01.2022 
580
Date of notification
07.01.2022
 
Date of receipt by the International Bureau
29.12.2021
[PDF] Statement of grant of protection made under Rule 18ter(1), NZ  20.01.2022, 2022/1 Gaz 
833
Interested Contracting Party(ies)
NZ
450
Publication number and date
2022/1 Gaz, 20.01.2022 
 
Date of receipt by the International Bureau
06.01.2022
[PDF] Statement of grant of protection made under Rule 18ter(1), BT  03.02.2022, 2022/3 Gaz 
833
Interested Contracting Party(ies)
BT
450
Publication number and date
2022/3 Gaz, 03.02.2022 
 
Date of receipt by the International Bureau
14.01.2022
[PDF] Statement of grant of protection made under Rule 18ter(1), MN  03.02.2022, 2022/3 Gaz 
833
Interested Contracting Party(ies)
MN
450
Publication number and date
2022/3 Gaz, 03.02.2022 
 
Date of receipt by the International Bureau
18.01.2022
[PDF] Statement of grant of protection made under Rule 18ter(1), SG  10.02.2022, 2022/4 Gaz 
833
Interested Contracting Party(ies)
SG
450
Publication number and date
2022/4 Gaz, 10.02.2022 
 
Date of receipt by the International Bureau
28.01.2022
[PDF] Ex Officio examination completed but opposition or observations by third parties still possible, under Rule 18bis(1), NO  17.02.2022, 2022/5 Gaz 
833
Interested Contracting Party(ies)
NO
450
Publication number and date
2022/5 Gaz, 17.02.2022 
 
Opposition end date
09.05.2022
[PDF] Statement of grant of protection made under Rule 18ter(1), UA  12.05.2022, 2022/17 Gaz 
833
Interested Contracting Party(ies)
UA
450
Publication number and date
2022/17 Gaz, 12.05.2022 
 
Date of receipt by the International Bureau
28.04.2022
Opposition possible after the 18 months time limit, CA  26.05.2022, 2022/19 Gaz 
833
Interested Contracting Party(ies)
CA
450
Publication number and date
2022/19 Gaz, 26.05.2022 
[PDF] Statement of grant of protection made under Rule 18ter(1), NO  09.06.2022, 2022/21 Gaz 
833
Interested Contracting Party(ies)
NO
450
Publication number and date
2022/21 Gaz, 09.06.2022 
 
Date of receipt by the International Bureau
23.05.2022
[PDF] Total provisional refusal of protection, MD  16.06.2022, 2022/22 Gaz 
833
Interested Contracting Party(ies)
MD
450
Publication number and date
2022/22 Gaz, 16.06.2022 
580
Date of notification
31.05.2022
 
Date of receipt by the International Bureau
25.05.2022
[PDF] Statement of grant of protection made under Rule 18ter(1), CH  16.06.2022, 2022/22 Gaz 
833
Interested Contracting Party(ies)
CH
450
Publication number and date
2022/22 Gaz, 16.06.2022 
 
Date of receipt by the International Bureau
02.06.2022
[PDF] Statement of grant of protection made under Rule 18ter(1), CO  23.06.2022, 2022/23 Gaz 
833
Interested Contracting Party(ies)
CO
450
Publication number and date
2022/23 Gaz, 23.06.2022 
 
Date of receipt by the International Bureau
04.06.2022
[PDF] Total provisional refusal of protection, MY  07.07.2022, 2022/25 Gaz 
833
Interested Contracting Party(ies)
MY
450
Publication number and date
2022/25 Gaz, 07.07.2022 
580
Date of notification
21.06.2022
 
Date of receipt by the International Bureau
15.06.2022
Statement of grant of protection made under Rule 18ter(1), ME  07.07.2022, 2022/25 Gaz 
833
Interested Contracting Party(ies)
ME
450
Publication number and date
2022/25 Gaz, 07.07.2022 
 
Date of receipt by the International Bureau
20.06.2022
[PDF] Total provisional refusal of protection, VN  04.08.2022, 2022/29 Gaz 
833
Interested Contracting Party(ies)
VN
450
Publication number and date
2022/29 Gaz, 04.08.2022 
580
Date of notification
22.07.2022
 
Date of receipt by the International Bureau
07.07.2022
[PDF] Statement of grant of protection made under Rule 18ter(1), MX  21.07.2022, 2022/27 Gaz 
833
Interested Contracting Party(ies)
MX
450
Publication number and date
2022/27 Gaz, 21.07.2022 
 
Date of receipt by the International Bureau
07.07.2022
[PDF] Total provisional refusal of protection, KR  18.08.2022, 2022/31 Gaz 
833
Interested Contracting Party(ies)
KR
450
Publication number and date
2022/31 Gaz, 18.08.2022 
580
Date of notification
02.08.2022
 
Date of receipt by the International Bureau
25.07.2022
[PDF] Statement of grant of protection following a provisional refusal under Rule 18ter(2)(i), PH  25.08.2022, 2022/32 Gaz 
833
Interested Contracting Party(ies)
PH
450
Publication number and date
2022/32 Gaz, 25.08.2022 
580
Date of notification
25.08.2022
 
Date of receipt by the International Bureau
08.08.2022
[PDF] Statement of grant of protection made under Rule 18ter(1), ID  25.08.2022, 2022/32 Gaz 
833
Interested Contracting Party(ies)
ID
450
Publication number and date
2022/32 Gaz, 25.08.2022 
 
Date of receipt by the International Bureau
11.08.2022
Statement of grant of protection made under Rule 18ter(1), BA  15.09.2022, 2022/35 Gaz 
833
Interested Contracting Party(ies)
BA
450
Publication number and date
2022/35 Gaz, 15.09.2022 
 
Date of receipt by the International Bureau
26.08.2022
[PDF] Ex Officio examination completed but opposition or observations by third parties still possible, under Rule 18bis(1), US  29.09.2022, 2022/37 Gaz 
833
Interested Contracting Party(ies)
US
450
Publication number and date
2022/37 Gaz, 29.09.2022 
[PDF] Statement of grant of protection made under Rule 18ter(1), TT  13.10.2022, 2022/39 Gaz 
833
Interested Contracting Party(ies)
TT
450
Publication number and date
2022/39 Gaz, 13.10.2022 
 
Date of receipt by the International Bureau
28.09.2022
[PDF] Ex Officio examination completed but opposition or observations by third parties still possible, under Rule 18bis(1), IL  03.11.2022, 2022/42 Gaz 
833
Interested Contracting Party(ies)
IL
450
Publication number and date
2022/42 Gaz, 03.11.2022 
Opposition possible after the 18 months time limit, KR  24.11.2022, 2022/45 Gaz 
833
Interested Contracting Party(ies)
KR
450
Publication number and date
2022/45 Gaz, 24.11.2022 
Opposition possible after the 18 months time limit, CA  01.12.2022, 2022/46 Gaz 
833
Interested Contracting Party(ies)
CA
450
Publication number and date
2022/46 Gaz, 01.12.2022 
Opposition possible after the 18 months time limit, IS  01.12.2022, 2022/46 Gaz 
833
Interested Contracting Party(ies)
IS
450
Publication number and date
2022/46 Gaz, 01.12.2022 
[PDF] Total provisional refusal of protection, KH  22.12.2022, 2022/49 Gaz 
833
Interested Contracting Party(ies)
KH
450
Publication number and date
2022/49 Gaz, 22.12.2022 
580
Date of notification
09.12.2022
 
Date of receipt by the International Bureau
29.11.2022
[PDF] Statement of grant of protection following a provisional refusal under Rule 18ter(2)(i), MD  29.12.2022, 2022/50 Gaz 
833
Interested Contracting Party(ies)
MD
450
Publication number and date
2022/50 Gaz, 29.12.2022 
580
Date of notification
13.12.2022
 
Date of receipt by the International Bureau
05.12.2022
Statement of grant of protection made under Rule 18ter(1), IS  19.01.2023, 2023/1 Gaz 
833
Interested Contracting Party(ies)
IS
450
Publication number and date
2023/1 Gaz, 19.01.2023 
 
Date of receipt by the International Bureau
29.12.2022
[PDF] Total provisional refusal of protection, TH  19.01.2023, 2023/1 Gaz 
833
Interested Contracting Party(ies)
TH
450
Publication number and date
2023/1 Gaz, 19.01.2023 
580
Date of notification
09.01.2023
 
Date of receipt by the International Bureau
05.01.2023
[PDF] Statement of grant of protection following a provisional refusal under Rule 18ter(2)(i), RS  02.02.2023, 2023/3 Gaz 
833
Interested Contracting Party(ies)
RS
450
Publication number and date
2023/3 Gaz, 02.02.2023 
580
Date of notification
18.01.2023
 
Date of receipt by the International Bureau
09.01.2023
[PDF] Statement of grant of protection following a provisional refusal under Rule 18ter(2)(i), IL  23.02.2023, 2023/6 Gaz 
833
Interested Contracting Party(ies)
IL
450
Publication number and date
2023/6 Gaz, 23.02.2023 
580
Date of notification
08.02.2023
 
Date of receipt by the International Bureau
02.02.2023
[PDF] Statement of grant of protection made under Rule 18ter(1), CA  16.03.2023, 2023/9 Gaz 
833
Interested Contracting Party(ies)
CA
450
Publication number and date
2023/9 Gaz, 16.03.2023 
 
Date of receipt by the International Bureau
08.02.2023
[PDF] Statement of grant of protection following a provisional refusal under Rule 18ter(2)(i), US  20.04.2023, 2023/14 Gaz 
833
Interested Contracting Party(ies)
US
450
Publication number and date
2023/14 Gaz, 20.04.2023 
580
Date of notification
04.04.2023
 
Date of receipt by the International Bureau
31.03.2023
[PDF] Statement indicating the goods and services for which protection of the mark is granted under Rule 18ter(2)(ii), KR  27.04.2023, 2023/15 Gaz 
833
Interested Contracting Party(ies)
KR
450
Publication number and date
2023/15 Gaz, 27.04.2023 
 
Goods and services for which protection of the mark is granted
12

Bicycles, including electric bicycles; parts, fittings and accessories for bicycles, including electric bicycles, namely, hubs, internal gear hubs, bicycle hub which contains dynamo inside, bicycle hub which contains bicycle power meter inside, hub quick release levers, hub quick release devices, axles of hubs, derailleurs, chain guides, freewheels, sprockets, pulleys adapted for use with bicycles, chains, cranks, crank which contains bicycle power meter inside, crank sets, front chain wheels, pedals, pedal which contains bicycle power meter inside, bicycle pedal cleats, toe clips, brake levers, brakes, brake cables, brake shoes, rims, brake rotors, brake pads, wheels, tires, inner tubes, spokes, spoke clips, bottom brackets, seat pillars, head parts for frame-fork assembly, suspensions, handlebars, handlebar stems, grips for handlebars, bar ends, seat posts, saddles, gear position indicators for bicycles, electric motors for bicycles, switches for bicycles.

580
Date of notification
27.04.2023
 
Date of receipt by the International Bureau
10.04.2023
[PDF] Statement of grant of protection following a provisional refusal under Rule 18ter(2)(i), KH  25.05.2023, 2023/19 Gaz 
833
Interested Contracting Party(ies)
KH
450
Publication number and date
2023/19 Gaz, 25.05.2023 
580
Date of notification
09.05.2023
 
Date of receipt by the International Bureau
19.04.2023
[PDF] Statement of grant of protection following a provisional refusal under Rule 18ter(2)(i), IN  14.11.2024, 2024/44 Gaz 
833
Interested Contracting Party(ies)
IN
450
Publication number and date
2024/44 Gaz, 14.11.2024 
580
Date of notification
30.10.2024
 
Date of receipt by the International Bureau
28.10.2024
[PDF] Statement of grant of protection following a provisional refusal under Rule 18ter(2)(i), MY  30.01.2025, 2025/3 Gaz 
833
Interested Contracting Party(ies)
MY
450
Publication number and date
2025/3 Gaz, 30.01.2025 
580
Date of notification
15.01.2025
 
Date of receipt by the International Bureau
24.12.2024
1600886 

 

LOADING

International Trademark
 

Disclaimer: The registration of a mark in the International Register does not imply the expression of any opinion whatsoever on the part of the International Bureau of WIPO concerning the substance of the entitlement claim under the Madrid Protocol and its Regulations, or of the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries.